U.S. Gold subsidiary Gold King has satisfied one of the conditions associated with the recently granted surface gold mine permit for its CK project in southeast Wyoming. The company was issued a pollutant discharge elimination system permit also known as a water discharge permit from the Wyoming Department of Environmental Quality. “The CK gold project continues to advance with the…
Read MoreTag: Prefeasibility Study
Positive prefeasibility study for Cactus mine project: Arizona Sonoran
Arizona Sonoran Copper has completed its NI 43-101 Prefeasibility Study (PFS) for its Cactus project in Arizona. The study outlines a lower risk, top 10 potential copper operation within the United States, producing LME Grade A copper cathodes onsite via heap leach and a solvent extraction/electrotwinning plant. Average annual production is estimated to be 55,000 tons of copper, with a…
Read MoreAmerican Rare Earths raises capital for Halleck Creek
American Rare Earths has received firm commitments via an institutional placement to raise gross proceeds of A$13.5 million at an issue price of $0.30 per share for the development of its Halleck Creek rare earths project in Wyoming. The company said the placement, together with existing cash, will be used for mineral resource and extensional drilling, a prefeasibility study, metallurgical…
Read MoreArizona Sonoran plans for the new year
Arizona Sonoran Copper Company has announced its 2023 work plan for the Cactus Property, inclusive of the Cactus and Parks/Salyer projects near Casa Grande, Ariz. All work streams this year will feed into the planned Prefeasibility Study (PFS) due in the fourth quarter 2023/first quarter 2024, and includes drilling, metallurgy, detailed engineering, permitting and technical studies, along with continued efforts…
Read More