Rio Tinto’s Kennecott expands solar power

Rio Tinto has approved construction of a new 25-megawatt solar plant at its Kennecott copper operation in Utah, bringing the mine’s total solar capacity to 30 MW. It will be located next to an existing 5-MW solar plant. “Expanding our solar farm is the latest step in our journey to reduce our carbon footprint. Together with other measures we’ve taken,…

Read More

Positive prefeasibility study for Cactus mine project: Arizona Sonoran

Arizona Sonoran Copper has completed its NI 43-101 Prefeasibility Study (PFS) for its Cactus project in Arizona. The study outlines a lower risk, top 10 potential copper operation within the United States, producing LME Grade A copper cathodes onsite via heap leach and a solvent extraction/electrotwinning plant. Average annual production is estimated to be 55,000 tons of copper, with a…

Read More

Pumpkin Hollow gets restart plan

A restart of operations and ramp-up of production is in the future of Nevada Copper’s Pumpkin Hollow complex in Yerington, Nev., after the company came to an agreement with lenders for a US$93 million infusion of funding for the underground mine. The plan for the copper operation, according to the company, includes a number of key components intended to de-risk…

Read More