{"id":9927,"date":"2025-04-02T18:33:26","date_gmt":"2025-04-02T18:33:26","guid":{"rendered":"https:\/\/northamericanmining.com\/?p=9927"},"modified":"2025-04-02T18:33:32","modified_gmt":"2025-04-02T18:33:32","slug":"first-concentrate-batch-at-terronera","status":"publish","type":"post","link":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/","title":{"rendered":"First concentrate batch at Terronera"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-9928\" src=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2025\/04\/Endeavour-Silver.jpg\" alt=\"\" width=\"800\" height=\"450\" srcset=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2025\/04\/Endeavour-Silver.jpg 800w, https:\/\/northamericanmining.com\/wp-content\/uploads\/2025\/04\/Endeavour-Silver-500x280.jpg 500w, https:\/\/northamericanmining.com\/wp-content\/uploads\/2025\/04\/Endeavour-Silver-768x432.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/p>\n\n\n<p class=\"wp-block-paragraph\">Endeavour Silver said its construction work at the Terronera project in the Jalisco state, Mexico, is nearing its final stages and it is producing its initial batch of concentrate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In an update report, the producer said wet commissioning is anticipated to begin early in the second quarter.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Advances to date include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Upper platform process plant commissioning well advanced<\/li>\n\n\n\n<li>The crushing, grinding, flotation and tailing thickening circuits successfully ran to produce over two tonnes of concentrate<\/li>\n\n\n\n<li>Concentrate filter pre-commissioning has started<\/li>\n\n\n\n<li>Tailing filter mechanical assembly was completed<\/li>\n\n\n\n<li>Tailing Storage Facility main embankment reached full height, and the underdrain piping with gravel cover has been installed and prepared for life of mine tailing placement<\/li>\n\n\n\n<li>The first production stope has been mined and backfilled<\/li>\n\n\n\n<li>Surface run-of-mine and crushed ore stockpiles have reached a total of 40,000 tonnes<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Its focus remains on completing the tailing filter electrical and mechanical installations and the pipeline connections between the upper and lower platforms, it said, as it plans an operational guidance update after the start of wet commissioning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Source: <\/em><a href=\"https:\/\/edrsilver.com\/\"><em>www.edrsilver.com<\/em><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Endeavour Silver said its construction work at the Terronera project in the Jalisco state, Mexico, is nearing its final stages and it is producing its initial batch of concentrate. In an update report, the producer said wet commissioning is anticipated to begin early in the second quarter. Advances to date include: Its focus remains on completing the tailing filter electrical&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[495],"tags":[3170],"coauthors":[1644],"class_list":["post-9927","post","type-post","status-publish","format-standard","hentry","category-latest-news","tag-endeavour-silver"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Endeavour Silver said its construction work at the Terronera project in the Jalisco state, Mexico, is nearing its final stages and it is producing its initial batch of concentrate. In an update report, the producer said wet commissioning is anticipated to begin early in the second quarter. Advances to date include: Upper platform process plant\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"NAM Staff\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"North American Mining Magazine - Bringing the North American Mining Industry Into Focus\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"First concentrate batch at Terronera - North American Mining Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Endeavour Silver said its construction work at the Terronera project in the Jalisco state, Mexico, is nearing its final stages and it is producing its initial batch of concentrate. In an update report, the producer said wet commissioning is anticipated to begin early in the second quarter. Advances to date include: Upper platform process plant\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-04-02T18:33:26+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-04-02T18:33:32+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/NAminingmag\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"First concentrate batch at Terronera - North American Mining Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Endeavour Silver said its construction work at the Terronera project in the Jalisco state, Mexico, is nearing its final stages and it is producing its initial batch of concentrate. In an update report, the producer said wet commissioning is anticipated to begin early in the second quarter. Advances to date include: Upper platform process plant\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/#blogposting\",\"name\":\"First concentrate batch at Terronera - North American Mining Magazine\",\"headline\":\"First concentrate batch at Terronera\",\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/Endeavour-Silver.jpg\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/#articleImage\",\"width\":800,\"height\":450},\"datePublished\":\"2025-04-02T18:33:26+00:00\",\"dateModified\":\"2025-04-02T18:33:32+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/#webpage\"},\"articleSection\":\"Latest News, Endeavour Silver, nampADM\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/northamericanmining.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/#listItem\",\"name\":\"Latest News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/#listItem\",\"position\":2,\"name\":\"Latest News\",\"item\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/#listItem\",\"name\":\"First concentrate batch at Terronera\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/#listItem\",\"position\":3,\"name\":\"First concentrate batch at Terronera\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/#listItem\",\"name\":\"Latest News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"telephone\":\"+13032830640\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/NAM_Logo.png\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/#organizationLogo\",\"width\":2384,\"height\":646},\"image\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/@semcopublishing\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/naminingmag\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/\",\"name\":\"NAM Staff\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/#webpage\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/\",\"name\":\"First concentrate batch at Terronera - North American Mining Magazine\",\"description\":\"Endeavour Silver said its construction work at the Terronera project in the Jalisco state, Mexico, is nearing its final stages and it is producing its initial batch of concentrate. In an update report, the producer said wet commissioning is anticipated to begin early in the second quarter. Advances to date include: Upper platform process plant\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/04\\\/02\\\/first-concentrate-batch-at-terronera\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"datePublished\":\"2025-04-02T18:33:26+00:00\",\"dateModified\":\"2025-04-02T18:33:32+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"First concentrate batch at Terronera - North American Mining Magazine","description":"Endeavour Silver said its construction work at the Terronera project in the Jalisco state, Mexico, is nearing its final stages and it is producing its initial batch of concentrate. In an update report, the producer said wet commissioning is anticipated to begin early in the second quarter. Advances to date include: Upper platform process plant","canonical_url":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/#blogposting","name":"First concentrate batch at Terronera - North American Mining Magazine","headline":"First concentrate batch at Terronera","author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2025\/04\/Endeavour-Silver.jpg","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/#articleImage","width":800,"height":450},"datePublished":"2025-04-02T18:33:26+00:00","dateModified":"2025-04-02T18:33:32+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/#webpage"},"isPartOf":{"@id":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/#webpage"},"articleSection":"Latest News, Endeavour Silver, nampADM"},{"@type":"BreadcrumbList","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","position":1,"name":"Home","item":"https:\/\/northamericanmining.com","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/#listItem","name":"Latest News"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/#listItem","position":2,"name":"Latest News","item":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/#listItem","name":"First concentrate batch at Terronera"},"previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/#listItem","position":3,"name":"First concentrate batch at Terronera","previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/#listItem","name":"Latest News"}}]},{"@type":"Organization","@id":"https:\/\/northamericanmining.com\/#organization","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","url":"https:\/\/northamericanmining.com\/","telephone":"+13032830640","logo":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/05\/NAM_Logo.png","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/#organizationLogo","width":2384,"height":646},"image":{"@id":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/#organizationLogo"},"sameAs":["https:\/\/www.youtube.com\/@semcopublishing","https:\/\/www.linkedin.com\/company\/naminingmag\/"]},{"@type":"Person","@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author","url":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/","name":"NAM Staff"},{"@type":"WebPage","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/#webpage","url":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/","name":"First concentrate batch at Terronera - North American Mining Magazine","description":"Endeavour Silver said its construction work at the Terronera project in the Jalisco state, Mexico, is nearing its final stages and it is producing its initial batch of concentrate. In an update report, the producer said wet commissioning is anticipated to begin early in the second quarter. Advances to date include: Upper platform process plant","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/northamericanmining.com\/#website"},"breadcrumb":{"@id":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/#breadcrumblist"},"author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"creator":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"datePublished":"2025-04-02T18:33:26+00:00","dateModified":"2025-04-02T18:33:32+00:00"},{"@type":"WebSite","@id":"https:\/\/northamericanmining.com\/#website","url":"https:\/\/northamericanmining.com\/","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","inLanguage":"en-US","publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"North American Mining Magazine - Bringing the North American Mining Industry Into Focus","og:type":"article","og:title":"First concentrate batch at Terronera - North American Mining Magazine","og:description":"Endeavour Silver said its construction work at the Terronera project in the Jalisco state, Mexico, is nearing its final stages and it is producing its initial batch of concentrate. In an update report, the producer said wet commissioning is anticipated to begin early in the second quarter. Advances to date include: Upper platform process plant","og:url":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/","og:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png","og:image:secure_url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png","article:published_time":"2025-04-02T18:33:26+00:00","article:modified_time":"2025-04-02T18:33:32+00:00","article:publisher":"https:\/\/www.facebook.com\/NAminingmag","twitter:card":"summary","twitter:title":"First concentrate batch at Terronera - North American Mining Magazine","twitter:description":"Endeavour Silver said its construction work at the Terronera project in the Jalisco state, Mexico, is nearing its final stages and it is producing its initial batch of concentrate. In an update report, the producer said wet commissioning is anticipated to begin early in the second quarter. Advances to date include: Upper platform process plant","twitter:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png"},"aioseo_meta_data":{"post_id":"9927","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2025-04-02 18:33:33","updated":"2025-07-01 01:33:01","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/\" title=\"Latest News\">Latest News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tFirst concentrate batch at Terronera\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/northamericanmining.com"},{"label":"Latest News","link":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/"},{"label":"First concentrate batch at Terronera","link":"https:\/\/northamericanmining.com\/index.php\/2025\/04\/02\/first-concentrate-batch-at-terronera\/"}],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/9927","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/comments?post=9927"}],"version-history":[{"count":1,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/9927\/revisions"}],"predecessor-version":[{"id":9929,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/9927\/revisions\/9929"}],"wp:attachment":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media?parent=9927"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/categories?post=9927"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/tags?post=9927"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/coauthors?post=9927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}