{"id":9090,"date":"2024-11-20T15:13:16","date_gmt":"2024-11-20T15:13:16","guid":{"rendered":"https:\/\/northamericanmining.com\/?p=9090"},"modified":"2025-03-03T18:14:18","modified_gmt":"2025-03-03T18:14:18","slug":"weir-wins-hvc-mill-order","status":"publish","type":"post","link":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/","title":{"rendered":"Weir wins HVC mill order"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-9091\" src=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/11\/Weir-Group.jpg\" alt=\"\" width=\"400\" height=\"533\" \/><\/p>\n\n\n<p class=\"wp-block-paragraph\">The Weir Group has confirmed it will supply its Warman slurry pumps and Cavex hydrocyclones to Teck\u2019s Highland Valley Copper Mine Life Extension (MLE) project in Canada, including North America\u2019s largest mill circuit pump.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Highland Valley Copper MLE project is targeting a mine life extension by enhancing existing site infrastructure, addressing the growing demand for copper driven by the transition to a low-carbon future. It is projected to yield about 1.95 million tons of additional copper over its lifespan.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the core of the project is the record-breaking pump, the Warman MCR 760, to complement Weir\u2019s existing and planned installations of equivalent-sized pumps in South America and Australia.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">\u201cThe Warman MCR 760 pump was developed to meet the demand for mill circuit pumps that can handle unprecedentedly high flow rates, minimizing the number of operating lines in a plant, and addressing the global trend of declining ore grades that require increased throughput for economical mineral recovery,\u201d the OEM said. \u201c[It] is designed to maximize wear life in arduous mill duties and facilitate easy and safe maintenance, regardless of an operator\u2019s maintenance schedule or approach.\u201d<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Weir will additionally supply its Cavex 800CVX and 650CVX hydrocyclones for the MLE project, and its service center in Kamloops, British Columbia, will back the installation and ensure efficient operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Source: <\/em><a href=\"https:\/\/www.global.weir\/processing-equipment\/mining\/\"><em>Weir<\/em><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Weir Group has confirmed it will supply its Warman slurry pumps and Cavex hydrocyclones to Teck\u2019s Highland Valley Copper Mine Life Extension (MLE) project in Canada, including North America\u2019s largest mill circuit pump. The Highland Valley Copper MLE project is targeting a mine life extension by enhancing existing site infrastructure, addressing the growing demand for copper driven by the&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[5,495],"tags":[2406,1838,969],"coauthors":[1644],"class_list":["post-9090","post","type-post","status-publish","format-standard","hentry","category-equipment-technology","category-latest-news","tag-hydrocyclones","tag-slurry-pumps","tag-weir-group"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The Weir Group has confirmed it will supply its Warman slurry pumps and Cavex hydrocyclones to Teck\u2019s Highland Valley Copper Mine Life Extension (MLE) project in Canada, including North America\u2019s largest mill circuit pump. The Highland Valley Copper MLE project is targeting a mine life extension by enhancing existing site infrastructure, addressing the growing demand\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"NAM Staff\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"North American Mining Magazine - Bringing the North American Mining Industry Into Focus\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Weir wins HVC mill order - North American Mining Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The Weir Group has confirmed it will supply its Warman slurry pumps and Cavex hydrocyclones to Teck\u2019s Highland Valley Copper Mine Life Extension (MLE) project in Canada, including North America\u2019s largest mill circuit pump. The Highland Valley Copper MLE project is targeting a mine life extension by enhancing existing site infrastructure, addressing the growing demand\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-11-20T15:13:16+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-03-03T18:14:18+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/NAminingmag\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Weir wins HVC mill order - North American Mining Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The Weir Group has confirmed it will supply its Warman slurry pumps and Cavex hydrocyclones to Teck\u2019s Highland Valley Copper Mine Life Extension (MLE) project in Canada, including North America\u2019s largest mill circuit pump. The Highland Valley Copper MLE project is targeting a mine life extension by enhancing existing site infrastructure, addressing the growing demand\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/#blogposting\",\"name\":\"Weir wins HVC mill order - North American Mining Magazine\",\"headline\":\"Weir wins HVC mill order\",\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/Weir-Group.jpg\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/#articleImage\",\"width\":400,\"height\":533},\"datePublished\":\"2024-11-20T15:13:16+00:00\",\"dateModified\":\"2025-03-03T18:14:18+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/#webpage\"},\"articleSection\":\"Equipment &amp; Infrastructure News, Latest News, Hydrocyclones, slurry pumps, Weir Group, nampADM\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/northamericanmining.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/equipment-technology\\\/#listItem\",\"name\":\"Equipment &amp; Infrastructure News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/equipment-technology\\\/#listItem\",\"position\":2,\"name\":\"Equipment &amp; Infrastructure News\",\"item\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/equipment-technology\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/#listItem\",\"name\":\"Weir wins HVC mill order\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/#listItem\",\"position\":3,\"name\":\"Weir wins HVC mill order\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/equipment-technology\\\/#listItem\",\"name\":\"Equipment &amp; Infrastructure News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"telephone\":\"+13032830640\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/NAM_Logo.png\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/#organizationLogo\",\"width\":2384,\"height\":646},\"image\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/@semcopublishing\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/naminingmag\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/\",\"name\":\"NAM Staff\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/#webpage\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/\",\"name\":\"Weir wins HVC mill order - North American Mining Magazine\",\"description\":\"The Weir Group has confirmed it will supply its Warman slurry pumps and Cavex hydrocyclones to Teck\\u2019s Highland Valley Copper Mine Life Extension (MLE) project in Canada, including North America\\u2019s largest mill circuit pump. The Highland Valley Copper MLE project is targeting a mine life extension by enhancing existing site infrastructure, addressing the growing demand\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/11\\\/20\\\/weir-wins-hvc-mill-order\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"datePublished\":\"2024-11-20T15:13:16+00:00\",\"dateModified\":\"2025-03-03T18:14:18+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Weir wins HVC mill order - North American Mining Magazine","description":"The Weir Group has confirmed it will supply its Warman slurry pumps and Cavex hydrocyclones to Teck\u2019s Highland Valley Copper Mine Life Extension (MLE) project in Canada, including North America\u2019s largest mill circuit pump. The Highland Valley Copper MLE project is targeting a mine life extension by enhancing existing site infrastructure, addressing the growing demand","canonical_url":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/#blogposting","name":"Weir wins HVC mill order - North American Mining Magazine","headline":"Weir wins HVC mill order","author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/11\/Weir-Group.jpg","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/#articleImage","width":400,"height":533},"datePublished":"2024-11-20T15:13:16+00:00","dateModified":"2025-03-03T18:14:18+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/#webpage"},"isPartOf":{"@id":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/#webpage"},"articleSection":"Equipment &amp; Infrastructure News, Latest News, Hydrocyclones, slurry pumps, Weir Group, nampADM"},{"@type":"BreadcrumbList","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","position":1,"name":"Home","item":"https:\/\/northamericanmining.com","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/#listItem","name":"Equipment &amp; Infrastructure News"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/#listItem","position":2,"name":"Equipment &amp; Infrastructure News","item":"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/#listItem","name":"Weir wins HVC mill order"},"previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/#listItem","position":3,"name":"Weir wins HVC mill order","previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/#listItem","name":"Equipment &amp; Infrastructure News"}}]},{"@type":"Organization","@id":"https:\/\/northamericanmining.com\/#organization","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","url":"https:\/\/northamericanmining.com\/","telephone":"+13032830640","logo":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/05\/NAM_Logo.png","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/#organizationLogo","width":2384,"height":646},"image":{"@id":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/#organizationLogo"},"sameAs":["https:\/\/www.youtube.com\/@semcopublishing","https:\/\/www.linkedin.com\/company\/naminingmag\/"]},{"@type":"Person","@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author","url":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/","name":"NAM Staff"},{"@type":"WebPage","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/#webpage","url":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/","name":"Weir wins HVC mill order - North American Mining Magazine","description":"The Weir Group has confirmed it will supply its Warman slurry pumps and Cavex hydrocyclones to Teck\u2019s Highland Valley Copper Mine Life Extension (MLE) project in Canada, including North America\u2019s largest mill circuit pump. The Highland Valley Copper MLE project is targeting a mine life extension by enhancing existing site infrastructure, addressing the growing demand","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/northamericanmining.com\/#website"},"breadcrumb":{"@id":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/#breadcrumblist"},"author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"creator":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"datePublished":"2024-11-20T15:13:16+00:00","dateModified":"2025-03-03T18:14:18+00:00"},{"@type":"WebSite","@id":"https:\/\/northamericanmining.com\/#website","url":"https:\/\/northamericanmining.com\/","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","inLanguage":"en-US","publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"North American Mining Magazine - Bringing the North American Mining Industry Into Focus","og:type":"article","og:title":"Weir wins HVC mill order - North American Mining Magazine","og:description":"The Weir Group has confirmed it will supply its Warman slurry pumps and Cavex hydrocyclones to Teck\u2019s Highland Valley Copper Mine Life Extension (MLE) project in Canada, including North America\u2019s largest mill circuit pump. The Highland Valley Copper MLE project is targeting a mine life extension by enhancing existing site infrastructure, addressing the growing demand","og:url":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/","og:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png","og:image:secure_url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png","article:published_time":"2024-11-20T15:13:16+00:00","article:modified_time":"2025-03-03T18:14:18+00:00","article:publisher":"https:\/\/www.facebook.com\/NAminingmag","twitter:card":"summary","twitter:title":"Weir wins HVC mill order - North American Mining Magazine","twitter:description":"The Weir Group has confirmed it will supply its Warman slurry pumps and Cavex hydrocyclones to Teck\u2019s Highland Valley Copper Mine Life Extension (MLE) project in Canada, including North America\u2019s largest mill circuit pump. The Highland Valley Copper MLE project is targeting a mine life extension by enhancing existing site infrastructure, addressing the growing demand","twitter:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png"},"aioseo_meta_data":{"post_id":"9090","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-11-20 15:13:21","updated":"2025-07-01 01:13:04","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/\" title=\"Equipment &amp; Infrastructure News\">Equipment &amp; Infrastructure News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tWeir wins HVC mill order\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/northamericanmining.com"},{"label":"Equipment &amp; Infrastructure News","link":"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/"},{"label":"Weir wins HVC mill order","link":"https:\/\/northamericanmining.com\/index.php\/2024\/11\/20\/weir-wins-hvc-mill-order\/"}],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/9090","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/comments?post=9090"}],"version-history":[{"count":1,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/9090\/revisions"}],"predecessor-version":[{"id":9093,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/9090\/revisions\/9093"}],"wp:attachment":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media?parent=9090"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/categories?post=9090"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/tags?post=9090"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/coauthors?post=9090"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}