{"id":7274,"date":"2024-05-07T18:10:17","date_gmt":"2024-05-07T18:10:17","guid":{"rendered":"https:\/\/northamericanmining.com\/?p=7274"},"modified":"2024-05-15T14:39:21","modified_gmt":"2024-05-15T14:39:21","slug":"beumer-inks-pipe-conveyor-contract-for-port-of-saguenay","status":"publish","type":"post","link":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/","title":{"rendered":"Beumer inks pipe conveyor contract for Port of Saguenay"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-7317\" src=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1.jpg\" alt=\"\" width=\"600\" height=\"402\" srcset=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1.jpg 841w, https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1-768x515.jpg 768w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n\n\n<p class=\"wp-block-paragraph\">Canadian-headquartered material handling system supplier <a href=\"https:\/\/www.beumergroup.com\" target=\"_blank\" rel=\"noopener\" title=\"\">Beumer Group<\/a> said in April it had inked a deal with the Port of Saguenay in Quebec for the supply of 2 kilometers (1.24 miles) of large two-way pipe conveyor as part of a C$111 million strategic development project at the site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Beumer officials said the conveyor will connect the port with customers in the new industrial port zone, which will be significant to boosting the region\u2019s economic growth as well as its commitment to a more sustainable maritime supply chain.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The pipe conveyor at the port, which is about 500 km (310 miles) north of Montreal, will have a downhill (export) capacity of 4,150 t\/h and an uphill (import) rate of 2,750 t\/h. It is designed to run along an existing steep and curvy road, reducing the need for truck transport and any associated carbon, dust and noise emissions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cBecause the pipe conveyor is fully enclosed, it reduces any environmental impacts and protects bulk materials from the sun, rain, snow, and wind,\u201d the company said. \u201cThe scope of the contract includes all mechanical, structural and electrical equipment including prefabricated electrical buildings and the control system.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Since the pipe conveyor is central to the port\u2019s new Multi-User Bulk Transport System, it will be key to the mission of increasing the port\u2019s capabilities to import and export iron ore, pellets, wood ships, salt, aggregates and other ores.<\/p>\n\n\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-7318\" src=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_portSaguenay.jpg\" alt=\"\" width=\"600\" height=\"398\" srcset=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_portSaguenay.jpg 834w, https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_portSaguenay-768x509.jpg 768w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n\n\n<p class=\"wp-block-paragraph\">\u201cIt will attract further investment in the region of Saguenay\u2013Lac-Saint-Jean,\u201d CEO Markus Schmidt said. \u201cOn awarding\u2026the contract, the Port of Saguenay Authority commented that they were particularly impressed with [our] engagement, commitment, and flexibility in understanding our requirements, especially regarding the importance to work with the community.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Schmidt noted the Saguenay project is an important milestone for both it as well as the region.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe expertise inherent in our global team enables us to deliver a conveyor solution on this scale, meeting the client\u2019s criteria for improving capacity in bulk handling while reducing environmental impacts.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The pipe conveyor is expected to be fully operational in 2025.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Canadian-headquartered material handling system supplier Beumer Group said in April it had inked a deal with the Port of Saguenay in Quebec for the supply of 2 kilometers (1.24 miles) of large two-way pipe conveyor as part of a C$111 million strategic development project at the site. Beumer officials said the conveyor will connect the port with customers in the&hellip;<\/p>\n","protected":false},"author":1,"featured_media":7317,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[4],"tags":[602,1612,1045,2883,2884,1109],"coauthors":[1644],"class_list":["post-7274","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","tag-beumer","tag-dump-trucks","tag-material-handling","tag-pipe-conveyor","tag-port-of-saguenay","tag-supply-chain"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Canadian-headquartered material handling system supplier Beumer Group said in April it had inked a deal with the Port of Saguenay in Quebec for the supply of 2 kilometers (1.24 miles) of large two-way pipe conveyor as part of a C$111 million strategic development project at the site. Beumer officials said the conveyor will connect the\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"NAM Staff\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"North American Mining Magazine - Bringing the North American Mining Industry Into Focus\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Beumer inks pipe conveyor contract for Port of Saguenay - North American Mining Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Canadian-headquartered material handling system supplier Beumer Group said in April it had inked a deal with the Port of Saguenay in Quebec for the supply of 2 kilometers (1.24 miles) of large two-way pipe conveyor as part of a C$111 million strategic development project at the site. Beumer officials said the conveyor will connect the\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"841\" \/>\n\t\t<meta property=\"og:image:height\" content=\"564\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-05-07T18:10:17+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-05-15T14:39:21+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/NAminingmag\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Beumer inks pipe conveyor contract for Port of Saguenay - North American Mining Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Canadian-headquartered material handling system supplier Beumer Group said in April it had inked a deal with the Port of Saguenay in Quebec for the supply of 2 kilometers (1.24 miles) of large two-way pipe conveyor as part of a C$111 million strategic development project at the site. Beumer officials said the conveyor will connect the\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#blogposting\",\"name\":\"Beumer inks pipe conveyor contract for Port of Saguenay - North American Mining Magazine\",\"headline\":\"Beumer inks pipe conveyor contract for Port of Saguenay\",\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/beumer_conveyor1.jpg\",\"width\":841,\"height\":564},\"datePublished\":\"2024-05-07T18:10:17+00:00\",\"dateModified\":\"2024-05-15T14:39:21+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#webpage\"},\"articleSection\":\"Features, Beumer, dump trucks, material handling, pipe conveyor, Port of Saguenay, supply chain, nampADM\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/northamericanmining.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/features\\\/#listItem\",\"name\":\"Features\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/features\\\/#listItem\",\"position\":2,\"name\":\"Features\",\"item\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/features\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#listItem\",\"name\":\"Beumer inks pipe conveyor contract for Port of Saguenay\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#listItem\",\"position\":3,\"name\":\"Beumer inks pipe conveyor contract for Port of Saguenay\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/features\\\/#listItem\",\"name\":\"Features\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"telephone\":\"+13032830640\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/NAM_Logo.png\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#organizationLogo\",\"width\":2384,\"height\":646},\"image\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/@semcopublishing\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/naminingmag\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/\",\"name\":\"NAM Staff\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#webpage\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/\",\"name\":\"Beumer inks pipe conveyor contract for Port of Saguenay - North American Mining Magazine\",\"description\":\"Canadian-headquartered material handling system supplier Beumer Group said in April it had inked a deal with the Port of Saguenay in Quebec for the supply of 2 kilometers (1.24 miles) of large two-way pipe conveyor as part of a C$111 million strategic development project at the site. Beumer officials said the conveyor will connect the\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/beumer_conveyor1.jpg\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#mainImage\",\"width\":841,\"height\":564},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2024\\\/05\\\/07\\\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\\\/#mainImage\"},\"datePublished\":\"2024-05-07T18:10:17+00:00\",\"dateModified\":\"2024-05-15T14:39:21+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Beumer inks pipe conveyor contract for Port of Saguenay - North American Mining Magazine","description":"Canadian-headquartered material handling system supplier Beumer Group said in April it had inked a deal with the Port of Saguenay in Quebec for the supply of 2 kilometers (1.24 miles) of large two-way pipe conveyor as part of a C$111 million strategic development project at the site. Beumer officials said the conveyor will connect the","canonical_url":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#blogposting","name":"Beumer inks pipe conveyor contract for Port of Saguenay - North American Mining Magazine","headline":"Beumer inks pipe conveyor contract for Port of Saguenay","author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1.jpg","width":841,"height":564},"datePublished":"2024-05-07T18:10:17+00:00","dateModified":"2024-05-15T14:39:21+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#webpage"},"isPartOf":{"@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#webpage"},"articleSection":"Features, Beumer, dump trucks, material handling, pipe conveyor, Port of Saguenay, supply chain, nampADM"},{"@type":"BreadcrumbList","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","position":1,"name":"Home","item":"https:\/\/northamericanmining.com","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/features\/#listItem","name":"Features"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/features\/#listItem","position":2,"name":"Features","item":"https:\/\/northamericanmining.com\/index.php\/category\/features\/","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#listItem","name":"Beumer inks pipe conveyor contract for Port of Saguenay"},"previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#listItem","position":3,"name":"Beumer inks pipe conveyor contract for Port of Saguenay","previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/features\/#listItem","name":"Features"}}]},{"@type":"Organization","@id":"https:\/\/northamericanmining.com\/#organization","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","url":"https:\/\/northamericanmining.com\/","telephone":"+13032830640","logo":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/05\/NAM_Logo.png","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#organizationLogo","width":2384,"height":646},"image":{"@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#organizationLogo"},"sameAs":["https:\/\/www.youtube.com\/@semcopublishing","https:\/\/www.linkedin.com\/company\/naminingmag\/"]},{"@type":"Person","@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author","url":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/","name":"NAM Staff"},{"@type":"WebPage","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#webpage","url":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/","name":"Beumer inks pipe conveyor contract for Port of Saguenay - North American Mining Magazine","description":"Canadian-headquartered material handling system supplier Beumer Group said in April it had inked a deal with the Port of Saguenay in Quebec for the supply of 2 kilometers (1.24 miles) of large two-way pipe conveyor as part of a C$111 million strategic development project at the site. Beumer officials said the conveyor will connect the","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/northamericanmining.com\/#website"},"breadcrumb":{"@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#breadcrumblist"},"author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"creator":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1.jpg","@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#mainImage","width":841,"height":564},"primaryImageOfPage":{"@id":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/#mainImage"},"datePublished":"2024-05-07T18:10:17+00:00","dateModified":"2024-05-15T14:39:21+00:00"},{"@type":"WebSite","@id":"https:\/\/northamericanmining.com\/#website","url":"https:\/\/northamericanmining.com\/","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","inLanguage":"en-US","publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"North American Mining Magazine - Bringing the North American Mining Industry Into Focus","og:type":"article","og:title":"Beumer inks pipe conveyor contract for Port of Saguenay - North American Mining Magazine","og:description":"Canadian-headquartered material handling system supplier Beumer Group said in April it had inked a deal with the Port of Saguenay in Quebec for the supply of 2 kilometers (1.24 miles) of large two-way pipe conveyor as part of a C$111 million strategic development project at the site. Beumer officials said the conveyor will connect the","og:url":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/","og:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1.jpg","og:image:secure_url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1.jpg","og:image:width":841,"og:image:height":564,"article:published_time":"2024-05-07T18:10:17+00:00","article:modified_time":"2024-05-15T14:39:21+00:00","article:publisher":"https:\/\/www.facebook.com\/NAminingmag","twitter:card":"summary","twitter:title":"Beumer inks pipe conveyor contract for Port of Saguenay - North American Mining Magazine","twitter:description":"Canadian-headquartered material handling system supplier Beumer Group said in April it had inked a deal with the Port of Saguenay in Quebec for the supply of 2 kilometers (1.24 miles) of large two-way pipe conveyor as part of a C$111 million strategic development project at the site. Beumer officials said the conveyor will connect the","twitter:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1.jpg"},"aioseo_meta_data":{"post_id":"7274","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-05-07 18:10:21","updated":"2025-07-01 00:37:04","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\/index.php\/category\/features\/\" title=\"Features\">Features<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tBeumer inks pipe conveyor contract for Port of Saguenay\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/northamericanmining.com"},{"label":"Features","link":"https:\/\/northamericanmining.com\/index.php\/category\/features\/"},{"label":"Beumer inks pipe conveyor contract for Port of Saguenay","link":"https:\/\/northamericanmining.com\/index.php\/2024\/05\/07\/beumer-inks-pipe-conveyor-contract-for-port-of-saguenay\/"}],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2024\/05\/beumer_conveyor1.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/7274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/comments?post=7274"}],"version-history":[{"count":3,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/7274\/revisions"}],"predecessor-version":[{"id":7319,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/7274\/revisions\/7319"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media\/7317"}],"wp:attachment":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media?parent=7274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/categories?post=7274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/tags?post=7274"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/coauthors?post=7274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}