{"id":6060,"date":"2023-10-20T14:40:36","date_gmt":"2023-10-20T14:40:36","guid":{"rendered":"https:\/\/northamericanmining.com\/?p=6060"},"modified":"2023-10-26T16:10:53","modified_gmt":"2023-10-26T16:10:53","slug":"metso-rio-tinto-move-to-next-phase-of-bioiron","status":"publish","type":"post","link":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/","title":{"rendered":"Metso, Rio Tinto move to next phase of BioIron"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Metso said it has been awarded a detailed design and engineering contract for Rio Tinto\u2019s continuous pilot plant (CPP) for the BioIron process \u2013 a low-carbon, iron-making process that the companies have been working together to progress.&nbsp;<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">\u201cWe are very excited to continue the close working relationship with Rio Tinto and to provide engineering and design support as we move to the next phase of development of the BioIron technology,\u201d said Matthias Gabriel, director, Ferrous at Metso.<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">BioIron uses raw biomass instead of metallurgical coal as a reductant and microwave energy to convert iron ore to metallic iron in the steelmaking process. BioIron, noted Rio Tinto, has the potential to support near-zero CO2 steelmaking, and can result in net negative emissions if linked with carbon capture and storage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The miner aims to move further toward full-scale implementation of the BioIron technology through operation of the CPP. Metso has been entrusted with the detailed design of the plant\u2019s reduction furnace and certain other equipment for the BioIron process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The effectiveness of the BioIron process was successfully proven through small-scale pilot tests conducted at Metso\u2019s Research Center in Frankfurt, Germany.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Metso said it has been awarded a detailed design and engineering contract for Rio Tinto\u2019s continuous pilot plant (CPP) for the BioIron process \u2013 a low-carbon, iron-making process that the companies have been working together to progress.&nbsp; \u201cWe are very excited to continue the close working relationship with Rio Tinto and to provide engineering and design support as we move&hellip;<\/p>\n","protected":false},"author":1,"featured_media":6144,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[5],"tags":[2448,2449,1158,182,1085],"coauthors":[1644],"class_list":["post-6060","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-equipment-technology","tag-bioiron-technology","tag-co2-steelmaking","tag-metso","tag-rio-tinto","tag-steelmaking"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Metso said it has been awarded a detailed design and engineering contract for Rio Tinto\u2019s continuous pilot plant (CPP) for the BioIron process \u2013 a low-carbon, iron-making process that the companies have been working together to progress. \u201cWe are very excited to continue the close working relationship with Rio Tinto and to provide engineering and\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"NAM Staff\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"North American Mining Magazine - Bringing the North American Mining Industry Into Focus\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Metso, Rio Tinto move to next phase of BioIron - North American Mining Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Metso said it has been awarded a detailed design and engineering contract for Rio Tinto\u2019s continuous pilot plant (CPP) for the BioIron process \u2013 a low-carbon, iron-making process that the companies have been working together to progress. \u201cWe are very excited to continue the close working relationship with Rio Tinto and to provide engineering and\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/Metso-Rio-Tinto.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/Metso-Rio-Tinto.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t\t<meta property=\"og:image:height\" content=\"224\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-10-20T14:40:36+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-10-26T16:10:53+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/NAminingmag\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Metso, Rio Tinto move to next phase of BioIron - North American Mining Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Metso said it has been awarded a detailed design and engineering contract for Rio Tinto\u2019s continuous pilot plant (CPP) for the BioIron process \u2013 a low-carbon, iron-making process that the companies have been working together to progress. \u201cWe are very excited to continue the close working relationship with Rio Tinto and to provide engineering and\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/Metso-Rio-Tinto.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#blogposting\",\"name\":\"Metso, Rio Tinto move to next phase of BioIron - North American Mining Magazine\",\"headline\":\"Metso, Rio Tinto move to next phase of BioIron\",\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Metso-Rio-Tinto.jpg\",\"width\":400,\"height\":224},\"datePublished\":\"2023-10-20T14:40:36+00:00\",\"dateModified\":\"2023-10-26T16:10:53+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#webpage\"},\"articleSection\":\"Equipment &amp; Infrastructure News, BioIron technology, CO2 steelmaking, Metso, Rio Tinto, steelmaking, nampADM\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/northamericanmining.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/equipment-technology\\\/#listItem\",\"name\":\"Equipment &amp; Infrastructure News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/equipment-technology\\\/#listItem\",\"position\":2,\"name\":\"Equipment &amp; Infrastructure News\",\"item\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/equipment-technology\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#listItem\",\"name\":\"Metso, Rio Tinto move to next phase of BioIron\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#listItem\",\"position\":3,\"name\":\"Metso, Rio Tinto move to next phase of BioIron\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/equipment-technology\\\/#listItem\",\"name\":\"Equipment &amp; Infrastructure News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"telephone\":\"+13032830640\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/NAM_Logo.png\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#organizationLogo\",\"width\":2384,\"height\":646},\"image\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/@semcopublishing\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/naminingmag\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/\",\"name\":\"NAM Staff\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#webpage\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/\",\"name\":\"Metso, Rio Tinto move to next phase of BioIron - North American Mining Magazine\",\"description\":\"Metso said it has been awarded a detailed design and engineering contract for Rio Tinto\\u2019s continuous pilot plant (CPP) for the BioIron process \\u2013 a low-carbon, iron-making process that the companies have been working together to progress. \\u201cWe are very excited to continue the close working relationship with Rio Tinto and to provide engineering and\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Metso-Rio-Tinto.jpg\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#mainImage\",\"width\":400,\"height\":224},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/10\\\/20\\\/metso-rio-tinto-move-to-next-phase-of-bioiron\\\/#mainImage\"},\"datePublished\":\"2023-10-20T14:40:36+00:00\",\"dateModified\":\"2023-10-26T16:10:53+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Metso, Rio Tinto move to next phase of BioIron - North American Mining Magazine","description":"Metso said it has been awarded a detailed design and engineering contract for Rio Tinto\u2019s continuous pilot plant (CPP) for the BioIron process \u2013 a low-carbon, iron-making process that the companies have been working together to progress. \u201cWe are very excited to continue the close working relationship with Rio Tinto and to provide engineering and","canonical_url":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#blogposting","name":"Metso, Rio Tinto move to next phase of BioIron - North American Mining Magazine","headline":"Metso, Rio Tinto move to next phase of BioIron","author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/Metso-Rio-Tinto.jpg","width":400,"height":224},"datePublished":"2023-10-20T14:40:36+00:00","dateModified":"2023-10-26T16:10:53+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#webpage"},"isPartOf":{"@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#webpage"},"articleSection":"Equipment &amp; Infrastructure News, BioIron technology, CO2 steelmaking, Metso, Rio Tinto, steelmaking, nampADM"},{"@type":"BreadcrumbList","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","position":1,"name":"Home","item":"https:\/\/northamericanmining.com","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/#listItem","name":"Equipment &amp; Infrastructure News"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/#listItem","position":2,"name":"Equipment &amp; Infrastructure News","item":"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#listItem","name":"Metso, Rio Tinto move to next phase of BioIron"},"previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#listItem","position":3,"name":"Metso, Rio Tinto move to next phase of BioIron","previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/#listItem","name":"Equipment &amp; Infrastructure News"}}]},{"@type":"Organization","@id":"https:\/\/northamericanmining.com\/#organization","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","url":"https:\/\/northamericanmining.com\/","telephone":"+13032830640","logo":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/05\/NAM_Logo.png","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#organizationLogo","width":2384,"height":646},"image":{"@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#organizationLogo"},"sameAs":["https:\/\/www.youtube.com\/@semcopublishing","https:\/\/www.linkedin.com\/company\/naminingmag\/"]},{"@type":"Person","@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author","url":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/","name":"NAM Staff"},{"@type":"WebPage","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#webpage","url":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/","name":"Metso, Rio Tinto move to next phase of BioIron - North American Mining Magazine","description":"Metso said it has been awarded a detailed design and engineering contract for Rio Tinto\u2019s continuous pilot plant (CPP) for the BioIron process \u2013 a low-carbon, iron-making process that the companies have been working together to progress. \u201cWe are very excited to continue the close working relationship with Rio Tinto and to provide engineering and","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/northamericanmining.com\/#website"},"breadcrumb":{"@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#breadcrumblist"},"author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"creator":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/Metso-Rio-Tinto.jpg","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#mainImage","width":400,"height":224},"primaryImageOfPage":{"@id":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/#mainImage"},"datePublished":"2023-10-20T14:40:36+00:00","dateModified":"2023-10-26T16:10:53+00:00"},{"@type":"WebSite","@id":"https:\/\/northamericanmining.com\/#website","url":"https:\/\/northamericanmining.com\/","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","inLanguage":"en-US","publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"North American Mining Magazine - Bringing the North American Mining Industry Into Focus","og:type":"article","og:title":"Metso, Rio Tinto move to next phase of BioIron - North American Mining Magazine","og:description":"Metso said it has been awarded a detailed design and engineering contract for Rio Tinto\u2019s continuous pilot plant (CPP) for the BioIron process \u2013 a low-carbon, iron-making process that the companies have been working together to progress. \u201cWe are very excited to continue the close working relationship with Rio Tinto and to provide engineering and","og:url":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/","og:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/Metso-Rio-Tinto.jpg","og:image:secure_url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/Metso-Rio-Tinto.jpg","og:image:width":400,"og:image:height":224,"article:published_time":"2023-10-20T14:40:36+00:00","article:modified_time":"2023-10-26T16:10:53+00:00","article:publisher":"https:\/\/www.facebook.com\/NAminingmag","twitter:card":"summary","twitter:title":"Metso, Rio Tinto move to next phase of BioIron - North American Mining Magazine","twitter:description":"Metso said it has been awarded a detailed design and engineering contract for Rio Tinto\u2019s continuous pilot plant (CPP) for the BioIron process \u2013 a low-carbon, iron-making process that the companies have been working together to progress. \u201cWe are very excited to continue the close working relationship with Rio Tinto and to provide engineering and","twitter:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/Metso-Rio-Tinto.jpg"},"aioseo_meta_data":{"post_id":"6060","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2023-10-20 14:40:39","updated":"2025-07-01 00:06:06","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/\" title=\"Equipment &amp; Infrastructure News\">Equipment &amp; Infrastructure News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tMetso, Rio Tinto move to next phase of BioIron\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/northamericanmining.com"},{"label":"Equipment &amp; Infrastructure News","link":"https:\/\/northamericanmining.com\/index.php\/category\/equipment-technology\/"},{"label":"Metso, Rio Tinto move to next phase of BioIron","link":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/20\/metso-rio-tinto-move-to-next-phase-of-bioiron\/"}],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/Metso-Rio-Tinto.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/6060","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/comments?post=6060"}],"version-history":[{"count":1,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/6060\/revisions"}],"predecessor-version":[{"id":6061,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/6060\/revisions\/6061"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media\/6144"}],"wp:attachment":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media?parent=6060"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/categories?post=6060"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/tags?post=6060"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/coauthors?post=6060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}