{"id":5961,"date":"2023-10-17T12:20:21","date_gmt":"2023-10-17T12:20:21","guid":{"rendered":"https:\/\/northamericanmining.com\/?p=5961"},"modified":"2023-10-19T16:25:11","modified_gmt":"2023-10-19T16:25:11","slug":"rio-tinto-kennecott-adds-solar-plant","status":"publish","type":"post","link":"https:\/\/northamericanmining.com\/index.php\/2023\/10\/17\/rio-tinto-kennecott-adds-solar-plant\/","title":{"rendered":"Rio Tinto Kennecott adds solar plant"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5963\" src=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/kennecottSolar-5518-1.jpg\" alt=\"\" width=\"800\" height=\"533\" srcset=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/kennecottSolar-5518-1.jpg 800w, https:\/\/northamericanmining.com\/wp-content\/uploads\/2023\/10\/kennecottSolar-5518-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/p>\n\n\n<p class=\"wp-block-paragraph\">Rio Tinto has wrapped up construction of a new 5-megawatt solar power plant that will run its Kennecott copper mine outside Salt Lake City, Utah.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The 12,800-solar-panel plan will serve as a pilot project, with its ultimate goal being to expand the mine\u2019s solar energy supply. Commissioning is scheduled in the coming weeks, and Rio Tinto said the addition will help it reduce its operational emissions by 3,000 tonnes of carbon dioxide equivalent annually.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The solar facility is part of the miner\u2019s priority shift to sustainable energy solutions; Kennecott closed its coal-fired plant in 2019 and transitioned to electricity paired with renewable energy certificates. That move reduced its carbon footprint by 65% and eliminated more than 1 million tons of carbon dioxide output per year.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rio Tinto Kennecott Managing Director Nate Foster said the complex has a \u201ckey role to play\u201d in its backing of the energy transition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe supply U.S. companies with the copper and tellurium they need to produce solar panels, wind turbines and conductors. We also continue to take steps to further decarbonize our business, from our battery electric vehicle trial to our renewable diesel trial and now to our very own solar plant,\u201d he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rio Tinti said it carefully selected the location for the 30-acre solar array so as to minimize visual and environmental impacts: \u201cIt is adjacent to other existing industrial operations, away from residential and commercial zones, with earthen berms from the railway providing a visual barrier to most of the installation,\u201d the company noted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rio Tinto aims to reduce its global Scope 1 and 2 emissions by 50% by 2030 and to achieve net zero emissions by 2050.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Source: <\/em><a href=\"https:\/\/www.riotinto.com\/\"><em>Rio Tinto<\/em><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rio Tinto has wrapped up construction of a new 5-megawatt solar power plant that will run its Kennecott copper mine outside Salt Lake City, Utah. The 12,800-solar-panel plan will serve as a pilot project, with its ultimate goal being to expand the mine\u2019s solar energy supply. Commissioning is scheduled in the coming weeks, and Rio Tinto said the addition will&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[495],"tags":[182,1336,2206,2409,2410],"coauthors":[1644],"class_list":["post-5961","post","type-post","status-publish","format-standard","hentry","category-latest-news","tag-rio-tinto","tag-solar-panels","tag-solar-power-plant","tag-sustainable-energy","tag-wind-turbines"],"aioseo_notices":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/5961","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/comments?post=5961"}],"version-history":[{"count":3,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/5961\/revisions"}],"predecessor-version":[{"id":6027,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/5961\/revisions\/6027"}],"wp:attachment":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media?parent=5961"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/categories?post=5961"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/tags?post=5961"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/coauthors?post=5961"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}