{"id":3804,"date":"2023-01-16T15:47:33","date_gmt":"2023-01-16T15:47:33","guid":{"rendered":"https:\/\/northamericanmining.com\/?p=3804"},"modified":"2023-02-26T17:09:04","modified_gmt":"2023-02-26T17:09:04","slug":"arizona-sonoran-plans-for-the-new-year","status":"publish","type":"post","link":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/","title":{"rendered":"Arizona Sonoran plans for the new year"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3716\" src=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/12\/cactus.jpeg\" alt=\"\" width=\"600\" height=\"450\" srcset=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/12\/cactus.jpeg 2048w, https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/12\/cactus-768x576.jpeg 768w, https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/12\/cactus-1536x1152.jpeg 1536w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n\n\n<p class=\"wp-block-paragraph\">Arizona Sonoran Copper Company has announced its 2023 work plan for the Cactus Property, inclusive of the Cactus and Parks\/Salyer projects near Casa Grande, Ariz.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">All work streams this year will feed into the planned Prefeasibility Study (PFS) due in the fourth quarter 2023\/first quarter 2024, and includes drilling, metallurgy, detailed engineering, permitting and technical studies, along with continued efforts to build the onsite operations and technical team.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis past year was pivotal as we developed Cactus and demonstrated scalability through the addition of the Parks\/Salyer deposit, which grew our Cactus project into the third largest independent copper project in the U.S.,\u201d said Arizona Sonoran President and CEO George Ogilvie.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis next year\u2019s milestones will be tied to the integration of the Cactus base case leachable material mine plan with potential new additions from the Parks\/Salyer deposit and the primary sulphide optionality currently being tested with Rio Tinto\u2019s Nuton technologies. We also aim to conduct pure additional exploration drilling on our underexplored property; which could add further value through success with the drill bit.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Drilling at Parks\/Salyer is focused on completing the infill to 250-feet (76-meters) spacing drilling program. Two drill rigs are completing the remaining 19 (47,000 ft.\/14,350 m) of the planned 46-hole (105,000 ft.\/32,000 m) program, with final assays expected within the second quarter.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Five columns will be constructed to a height of 30 ft. (9 m) to test both oxide and enriched materials from Parks\/Salyer and Cactus. In addition, Rio Tinto is operating columns related to the Nuton leaching technologies, including samples from the oxide, enriched and primary sulphide material from both Cactus and Parks\/Salyer, as well as from the stockpile and tailings facility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Cactus Project is Arizona Sonoran\u2019s principal asset.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Source: <\/em><a href=\"https:\/\/arizonasonoran.com\/\"><em>Arizona Sonoran<\/em><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Arizona Sonoran Copper Company has announced its 2023 work plan for the Cactus Property, inclusive of the Cactus and Parks\/Salyer projects near Casa Grande, Ariz.&nbsp; All work streams this year will feed into the planned Prefeasibility Study (PFS) due in the fourth quarter 2023\/first quarter 2024, and includes drilling, metallurgy, detailed engineering, permitting and technical studies, along with continued efforts&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[495,8],"tags":[1696,1697,182],"coauthors":[1644],"class_list":["post-3804","post","type-post","status-publish","format-standard","hentry","category-latest-news","category-miners-news","tag-arizona-sonoran-copper-company","tag-prefeasibility-study","tag-rio-tinto"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Arizona Sonoran Copper Company has announced its 2023 work plan for the Cactus Property, inclusive of the Cactus and Parks\/Salyer projects near Casa Grande, Ariz. All work streams this year will feed into the planned Prefeasibility Study (PFS) due in the fourth quarter 2023\/first quarter 2024, and includes drilling, metallurgy, detailed engineering, permitting and technical\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"NAM Staff\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"North American Mining Magazine - Bringing the North American Mining Industry Into Focus\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Arizona Sonoran plans for the new year - North American Mining Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Arizona Sonoran Copper Company has announced its 2023 work plan for the Cactus Property, inclusive of the Cactus and Parks\/Salyer projects near Casa Grande, Ariz. All work streams this year will feed into the planned Prefeasibility Study (PFS) due in the fourth quarter 2023\/first quarter 2024, and includes drilling, metallurgy, detailed engineering, permitting and technical\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-01-16T15:47:33+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-02-26T17:09:04+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/NAminingmag\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Arizona Sonoran plans for the new year - North American Mining Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Arizona Sonoran Copper Company has announced its 2023 work plan for the Cactus Property, inclusive of the Cactus and Parks\/Salyer projects near Casa Grande, Ariz. All work streams this year will feed into the planned Prefeasibility Study (PFS) due in the fourth quarter 2023\/first quarter 2024, and includes drilling, metallurgy, detailed engineering, permitting and technical\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/#blogposting\",\"name\":\"Arizona Sonoran plans for the new year - North American Mining Magazine\",\"headline\":\"Arizona Sonoran plans for the new year\",\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/cactus.jpeg\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/#articleImage\",\"width\":2048,\"height\":1536},\"datePublished\":\"2023-01-16T15:47:33+00:00\",\"dateModified\":\"2023-02-26T17:09:04+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/#webpage\"},\"articleSection\":\"Latest News, Western Miners News, Arizona Sonoran Copper Company, Prefeasibility Study, Rio Tinto, nampADM\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/northamericanmining.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/miners-news\\\/#listItem\",\"name\":\"Western Miners News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/miners-news\\\/#listItem\",\"position\":2,\"name\":\"Western Miners News\",\"item\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/miners-news\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/#listItem\",\"name\":\"Arizona Sonoran plans for the new year\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/#listItem\",\"position\":3,\"name\":\"Arizona Sonoran plans for the new year\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/miners-news\\\/#listItem\",\"name\":\"Western Miners News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"telephone\":\"+13032830640\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/NAM_Logo.png\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/#organizationLogo\",\"width\":2384,\"height\":646},\"image\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/@semcopublishing\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/naminingmag\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/\",\"name\":\"NAM Staff\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/#webpage\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/\",\"name\":\"Arizona Sonoran plans for the new year - North American Mining Magazine\",\"description\":\"Arizona Sonoran Copper Company has announced its 2023 work plan for the Cactus Property, inclusive of the Cactus and Parks\\\/Salyer projects near Casa Grande, Ariz. All work streams this year will feed into the planned Prefeasibility Study (PFS) due in the fourth quarter 2023\\\/first quarter 2024, and includes drilling, metallurgy, detailed engineering, permitting and technical\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2023\\\/01\\\/16\\\/arizona-sonoran-plans-for-the-new-year\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"datePublished\":\"2023-01-16T15:47:33+00:00\",\"dateModified\":\"2023-02-26T17:09:04+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Arizona Sonoran plans for the new year - North American Mining Magazine","description":"Arizona Sonoran Copper Company has announced its 2023 work plan for the Cactus Property, inclusive of the Cactus and Parks\/Salyer projects near Casa Grande, Ariz. All work streams this year will feed into the planned Prefeasibility Study (PFS) due in the fourth quarter 2023\/first quarter 2024, and includes drilling, metallurgy, detailed engineering, permitting and technical","canonical_url":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/#blogposting","name":"Arizona Sonoran plans for the new year - North American Mining Magazine","headline":"Arizona Sonoran plans for the new year","author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/12\/cactus.jpeg","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/#articleImage","width":2048,"height":1536},"datePublished":"2023-01-16T15:47:33+00:00","dateModified":"2023-02-26T17:09:04+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/#webpage"},"isPartOf":{"@id":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/#webpage"},"articleSection":"Latest News, Western Miners News, Arizona Sonoran Copper Company, Prefeasibility Study, Rio Tinto, nampADM"},{"@type":"BreadcrumbList","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","position":1,"name":"Home","item":"https:\/\/northamericanmining.com","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/miners-news\/#listItem","name":"Western Miners News"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/miners-news\/#listItem","position":2,"name":"Western Miners News","item":"https:\/\/northamericanmining.com\/index.php\/category\/miners-news\/","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/#listItem","name":"Arizona Sonoran plans for the new year"},"previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/#listItem","position":3,"name":"Arizona Sonoran plans for the new year","previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/miners-news\/#listItem","name":"Western Miners News"}}]},{"@type":"Organization","@id":"https:\/\/northamericanmining.com\/#organization","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","url":"https:\/\/northamericanmining.com\/","telephone":"+13032830640","logo":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/05\/NAM_Logo.png","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/#organizationLogo","width":2384,"height":646},"image":{"@id":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/#organizationLogo"},"sameAs":["https:\/\/www.youtube.com\/@semcopublishing","https:\/\/www.linkedin.com\/company\/naminingmag\/"]},{"@type":"Person","@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author","url":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/","name":"NAM Staff"},{"@type":"WebPage","@id":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/#webpage","url":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/","name":"Arizona Sonoran plans for the new year - North American Mining Magazine","description":"Arizona Sonoran Copper Company has announced its 2023 work plan for the Cactus Property, inclusive of the Cactus and Parks\/Salyer projects near Casa Grande, Ariz. All work streams this year will feed into the planned Prefeasibility Study (PFS) due in the fourth quarter 2023\/first quarter 2024, and includes drilling, metallurgy, detailed engineering, permitting and technical","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/northamericanmining.com\/#website"},"breadcrumb":{"@id":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/#breadcrumblist"},"author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"creator":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"datePublished":"2023-01-16T15:47:33+00:00","dateModified":"2023-02-26T17:09:04+00:00"},{"@type":"WebSite","@id":"https:\/\/northamericanmining.com\/#website","url":"https:\/\/northamericanmining.com\/","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","inLanguage":"en-US","publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"North American Mining Magazine - Bringing the North American Mining Industry Into Focus","og:type":"article","og:title":"Arizona Sonoran plans for the new year - North American Mining Magazine","og:description":"Arizona Sonoran Copper Company has announced its 2023 work plan for the Cactus Property, inclusive of the Cactus and Parks\/Salyer projects near Casa Grande, Ariz. All work streams this year will feed into the planned Prefeasibility Study (PFS) due in the fourth quarter 2023\/first quarter 2024, and includes drilling, metallurgy, detailed engineering, permitting and technical","og:url":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/","og:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png","og:image:secure_url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png","article:published_time":"2023-01-16T15:47:33+00:00","article:modified_time":"2023-02-26T17:09:04+00:00","article:publisher":"https:\/\/www.facebook.com\/NAminingmag","twitter:card":"summary","twitter:title":"Arizona Sonoran plans for the new year - North American Mining Magazine","twitter:description":"Arizona Sonoran Copper Company has announced its 2023 work plan for the Cactus Property, inclusive of the Cactus and Parks\/Salyer projects near Casa Grande, Ariz. All work streams this year will feed into the planned Prefeasibility Study (PFS) due in the fourth quarter 2023\/first quarter 2024, and includes drilling, metallurgy, detailed engineering, permitting and technical","twitter:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png"},"aioseo_meta_data":{"post_id":"3804","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2023-01-16 15:47:36","updated":"2025-06-30 23:24:02","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\/index.php\/category\/miners-news\/\" title=\"Western Miners News\">Western Miners News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tArizona Sonoran plans for the new year\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/northamericanmining.com"},{"label":"Western Miners News","link":"https:\/\/northamericanmining.com\/index.php\/category\/miners-news\/"},{"label":"Arizona Sonoran plans for the new year","link":"https:\/\/northamericanmining.com\/index.php\/2023\/01\/16\/arizona-sonoran-plans-for-the-new-year\/"}],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/3804","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/comments?post=3804"}],"version-history":[{"count":3,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/3804\/revisions"}],"predecessor-version":[{"id":4058,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/3804\/revisions\/4058"}],"wp:attachment":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media?parent=3804"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/categories?post=3804"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/tags?post=3804"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/coauthors?post=3804"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}