{"id":1813,"date":"2022-02-04T19:18:07","date_gmt":"2022-02-04T19:18:07","guid":{"rendered":"https:\/\/northamericanmining.com\/?p=1813"},"modified":"2022-02-11T21:47:14","modified_gmt":"2022-02-11T21:47:14","slug":"metso-outotec-sending-grinding-equipment-to-las-truchas-2","status":"publish","type":"post","link":"https:\/\/northamericanmining.com\/index.php\/2022\/02\/04\/metso-outotec-sending-grinding-equipment-to-las-truchas-2\/","title":{"rendered":"Metso Outotec sending grinding equipment to Las Truchas"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-1967\" src=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/02\/metso-mexico-e1644615997659.jpg\" alt=\"\" width=\"400\" height=\"300\" \/><\/p>\n\n\n<p class=\"wp-block-paragraph\">Metso Outotec landed a \u20ac17 million order for key grinding equipment for ArcelorMittal\u2019s Las Truchas iron ore processing facility in Mexico, which is currently undergoing a refurbishment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The 2.3-million-ton-per-year plant will be getting two new Premier grinding mills under the transaction, each with installed power of 19 megawatts, as well as an in-house designed Mill Reline Machine to permit the safe and efficient replacement of its steel and rubber lining systems. It will also get an operations-friendly Select ball feeder and spare parts. Metso Outotec said the order was reflected on its books for 4Q2021.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWith our Planet Positive Premier grinding mills and associated life cycle service offerings, our customer will be able to expand their iron ore production in a safe, efficient and environmentally responsible way in partnership with us,\u201d said Andy Lingenfelter, vice president of Minerals Sales, North and Central America at Metso Outotec.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Metso Outotec landed a \u20ac17 million order for key grinding equipment for ArcelorMittal\u2019s Las Truchas iron ore processing facility in Mexico, which is currently undergoing a refurbishment. The 2.3-million-ton-per-year plant will be getting two new Premier grinding mills under the transaction, each with installed power of 19 megawatts, as well as an in-house designed Mill Reline Machine to permit the&hellip;<\/p>\n","protected":false},"author":1,"featured_media":1967,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[12],"tags":[821,822,216],"coauthors":[],"class_list":["post-1813","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-the-headlines","tag-arcelormittal-2","tag-grinding-mills","tag-metso-outotec"],"aioseo_notices":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/02\/metso-mexico-e1644615997659.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/1813","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/comments?post=1813"}],"version-history":[{"count":4,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/1813\/revisions"}],"predecessor-version":[{"id":1969,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/1813\/revisions\/1969"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media\/1967"}],"wp:attachment":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media?parent=1813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/categories?post=1813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/tags?post=1813"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/coauthors?post=1813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}