{"id":1696,"date":"2022-01-17T14:03:57","date_gmt":"2022-01-17T14:03:57","guid":{"rendered":"https:\/\/northamericanmining.com\/?p=1696"},"modified":"2022-01-17T14:05:20","modified_gmt":"2022-01-17T14:05:20","slug":"bayhorse-silver-mine-completes-mill-refurb","status":"publish","type":"post","link":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/","title":{"rendered":"Bayhorse silver mine completes mill refurb"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-1697 size-medium\" src=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse-300x300.jpeg\" alt=\"\" width=\"300\" height=\"300\" srcset=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse-300x300.jpeg 300w, https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse-1024x1024.jpeg 1024w, https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse-150x150.jpeg 150w, https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse-600x600.jpeg 600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n\n\n<p class=\"wp-block-paragraph\">Just 90 days after receiving its initial permit to build, Canadian miner Bayhorse Silver has completed the new upgraded milling facility in Payette, Idaho, and has restarted milling operations at the site which supports its nearby Bayhorse mine in Oregon.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During the building period, the company said it processed a substantial amount of silver material through its Steinert ore sorter; all of that material was extracted during mine drilling, exploration and safety programs to ensure safe development drifts for mining.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ore-sorted material, meanwhile, along with fines under 8 mm are now being transported to the newly upgraded mill facility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Both the mine and mill are designed to have a minimal environmental footprint through the use of ore-sorting, Bayhorse said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Furthermore, the operation has an additional grinding mill, providing a grind and regrind capacity to ensure an 80-micron grind size. It developed the system while testing between 2017 and 2020 at Metsolve Metallurgical Laboratories of Langley, British Columbia, for maximum recoveries.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201c[We have] added three stages of dewatering and fines recovery, as well as a precipitation circuit to enable the tailings to be recycled into eco-blocks, and to reduce dissolved contaminants to comply with the Idaho DEQ minimum requirements for wastewater disposal,\u201d officials noted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Upgrading the mill to its 50-60 ton\/day capacity, which equates to an ore-sorted mining rate of up to 200 t\/d, will allow it to satisfy the silver offtake agreement it has with Ocean Partners UK for delivery of its first 300 tonnes of silver concentrate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Source: <\/em><a href=\"http:\/\/www.bayhorsesilver.com\/\"><em>Bayhorse Silver<\/em><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Just 90 days after receiving its initial permit to build, Canadian miner Bayhorse Silver has completed the new upgraded milling facility in Payette, Idaho, and has restarted milling operations at the site which supports its nearby Bayhorse mine in Oregon. During the building period, the company said it processed a substantial amount of silver material through its Steinert ore sorter;&hellip;<\/p>\n","protected":false},"author":1,"featured_media":1697,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[495],"tags":[840,841,842],"coauthors":[],"class_list":["post-1696","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news","tag-bayhorse-silver","tag-milling-operations","tag-ore-sorter"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Just 90 days after receiving its initial permit to build, Canadian miner Bayhorse Silver has completed the new upgraded milling facility in Payette, Idaho, and has restarted milling operations at the site which supports its nearby Bayhorse mine in Oregon. During the building period, the company said it processed a substantial amount of silver material\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"NAM Staff\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"North American Mining Magazine - Bringing the North American Mining Industry Into Focus\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Bayhorse silver mine completes mill refurb - North American Mining Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Just 90 days after receiving its initial permit to build, Canadian miner Bayhorse Silver has completed the new upgraded milling facility in Payette, Idaho, and has restarted milling operations at the site which supports its nearby Bayhorse mine in Oregon. During the building period, the company said it processed a substantial amount of silver material\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse.jpeg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse.jpeg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t\t<meta property=\"og:image:height\" content=\"2048\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2022-01-17T14:03:57+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2022-01-17T14:05:20+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/NAminingmag\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Bayhorse silver mine completes mill refurb - North American Mining Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Just 90 days after receiving its initial permit to build, Canadian miner Bayhorse Silver has completed the new upgraded milling facility in Payette, Idaho, and has restarted milling operations at the site which supports its nearby Bayhorse mine in Oregon. During the building period, the company said it processed a substantial amount of silver material\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse.jpeg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#blogposting\",\"name\":\"Bayhorse silver mine completes mill refurb - North American Mining Magazine\",\"headline\":\"Bayhorse silver mine completes mill refurb\",\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/underground_at_bayhorse.jpeg\",\"width\":1536,\"height\":2048},\"datePublished\":\"2022-01-17T14:03:57+00:00\",\"dateModified\":\"2022-01-17T14:05:20+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#webpage\"},\"articleSection\":\"Latest News, Bayhorse Silver, milling operations, ore sorter\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/northamericanmining.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/#listItem\",\"name\":\"Latest News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/#listItem\",\"position\":2,\"name\":\"Latest News\",\"item\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#listItem\",\"name\":\"Bayhorse silver mine completes mill refurb\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#listItem\",\"position\":3,\"name\":\"Bayhorse silver mine completes mill refurb\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/#listItem\",\"name\":\"Latest News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"telephone\":\"+13032830640\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/NAM_Logo.png\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#organizationLogo\",\"width\":2384,\"height\":646},\"image\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/@semcopublishing\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/naminingmag\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/\",\"name\":\"NAM Staff\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#webpage\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/\",\"name\":\"Bayhorse silver mine completes mill refurb - North American Mining Magazine\",\"description\":\"Just 90 days after receiving its initial permit to build, Canadian miner Bayhorse Silver has completed the new upgraded milling facility in Payette, Idaho, and has restarted milling operations at the site which supports its nearby Bayhorse mine in Oregon. During the building period, the company said it processed a substantial amount of silver material\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/underground_at_bayhorse.jpeg\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#mainImage\",\"width\":1536,\"height\":2048},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2022\\\/01\\\/17\\\/bayhorse-silver-mine-completes-mill-refurb\\\/#mainImage\"},\"datePublished\":\"2022-01-17T14:03:57+00:00\",\"dateModified\":\"2022-01-17T14:05:20+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Bayhorse silver mine completes mill refurb - North American Mining Magazine","description":"Just 90 days after receiving its initial permit to build, Canadian miner Bayhorse Silver has completed the new upgraded milling facility in Payette, Idaho, and has restarted milling operations at the site which supports its nearby Bayhorse mine in Oregon. During the building period, the company said it processed a substantial amount of silver material","canonical_url":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#blogposting","name":"Bayhorse silver mine completes mill refurb - North American Mining Magazine","headline":"Bayhorse silver mine completes mill refurb","author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse.jpeg","width":1536,"height":2048},"datePublished":"2022-01-17T14:03:57+00:00","dateModified":"2022-01-17T14:05:20+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#webpage"},"isPartOf":{"@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#webpage"},"articleSection":"Latest News, Bayhorse Silver, milling operations, ore sorter"},{"@type":"BreadcrumbList","@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","position":1,"name":"Home","item":"https:\/\/northamericanmining.com","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/#listItem","name":"Latest News"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/#listItem","position":2,"name":"Latest News","item":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#listItem","name":"Bayhorse silver mine completes mill refurb"},"previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#listItem","position":3,"name":"Bayhorse silver mine completes mill refurb","previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/#listItem","name":"Latest News"}}]},{"@type":"Organization","@id":"https:\/\/northamericanmining.com\/#organization","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","url":"https:\/\/northamericanmining.com\/","telephone":"+13032830640","logo":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/05\/NAM_Logo.png","@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#organizationLogo","width":2384,"height":646},"image":{"@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#organizationLogo"},"sameAs":["https:\/\/www.youtube.com\/@semcopublishing","https:\/\/www.linkedin.com\/company\/naminingmag\/"]},{"@type":"Person","@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author","url":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/","name":"NAM Staff"},{"@type":"WebPage","@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#webpage","url":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/","name":"Bayhorse silver mine completes mill refurb - North American Mining Magazine","description":"Just 90 days after receiving its initial permit to build, Canadian miner Bayhorse Silver has completed the new upgraded milling facility in Payette, Idaho, and has restarted milling operations at the site which supports its nearby Bayhorse mine in Oregon. During the building period, the company said it processed a substantial amount of silver material","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/northamericanmining.com\/#website"},"breadcrumb":{"@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#breadcrumblist"},"author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"creator":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse.jpeg","@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#mainImage","width":1536,"height":2048},"primaryImageOfPage":{"@id":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/#mainImage"},"datePublished":"2022-01-17T14:03:57+00:00","dateModified":"2022-01-17T14:05:20+00:00"},{"@type":"WebSite","@id":"https:\/\/northamericanmining.com\/#website","url":"https:\/\/northamericanmining.com\/","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","inLanguage":"en-US","publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"North American Mining Magazine - Bringing the North American Mining Industry Into Focus","og:type":"article","og:title":"Bayhorse silver mine completes mill refurb - North American Mining Magazine","og:description":"Just 90 days after receiving its initial permit to build, Canadian miner Bayhorse Silver has completed the new upgraded milling facility in Payette, Idaho, and has restarted milling operations at the site which supports its nearby Bayhorse mine in Oregon. During the building period, the company said it processed a substantial amount of silver material","og:url":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/","og:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse.jpeg","og:image:secure_url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse.jpeg","og:image:width":1536,"og:image:height":2048,"article:published_time":"2022-01-17T14:03:57+00:00","article:modified_time":"2022-01-17T14:05:20+00:00","article:publisher":"https:\/\/www.facebook.com\/NAminingmag","twitter:card":"summary","twitter:title":"Bayhorse silver mine completes mill refurb - North American Mining Magazine","twitter:description":"Just 90 days after receiving its initial permit to build, Canadian miner Bayhorse Silver has completed the new upgraded milling facility in Payette, Idaho, and has restarted milling operations at the site which supports its nearby Bayhorse mine in Oregon. During the building period, the company said it processed a substantial amount of silver material","twitter:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse.jpeg"},"aioseo_meta_data":{"post_id":"1696","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[],"defaultGraph":"","defaultPostTypeGraph":""},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2022-05-31 18:35:14","updated":"2025-06-30 22:38:03","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/\" title=\"Latest News\">Latest News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tBayhorse silver mine completes mill refurb\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/northamericanmining.com"},{"label":"Latest News","link":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/"},{"label":"Bayhorse silver mine completes mill refurb","link":"https:\/\/northamericanmining.com\/index.php\/2022\/01\/17\/bayhorse-silver-mine-completes-mill-refurb\/"}],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/01\/underground_at_bayhorse.jpeg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/1696","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/comments?post=1696"}],"version-history":[{"count":2,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/1696\/revisions"}],"predecessor-version":[{"id":1699,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/1696\/revisions\/1699"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media\/1697"}],"wp:attachment":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media?parent=1696"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/categories?post=1696"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/tags?post=1696"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/coauthors?post=1696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}