{"id":11413,"date":"2025-11-17T20:24:12","date_gmt":"2025-11-17T20:24:12","guid":{"rendered":"https:\/\/northamericanmining.com\/?p=11413"},"modified":"2025-11-17T20:25:22","modified_gmt":"2025-11-17T20:25:22","slug":"bqe-commences-operation-of-selen-ix-plant-at-wharf","status":"publish","type":"post","link":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/","title":{"rendered":"BQE commences operation of Selen-IX plant at Wharf"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">BQE Water reported last week that a new full-scale Selen-IX plant located at Coeur\u2019s Wharf gold mine in South Dakota had passed the performance test and began routine operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This latest Selen-IX plant set a record time for implementation of 20 months between the design engineering kick-off to the discharge of on-spec water into the environment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The plant is designed to treat between 150 to 400 gallons of influent water per minute, removing selenium to a discharge limit of less than 5 parts per billion. The performance test was very thorough and involved plant operation at the minimum, nominal, and maximum flowrates and selenium concentrations artificially spiked to double the current and historical levels.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The plant has now entered routine operations under long-term support from BQE Water to ensure that the plant continues to perform and comply with regulatory requirements.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"459\" src=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2025\/11\/BQE.jpg\" alt=\"\" class=\"wp-image-11415\" srcset=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2025\/11\/BQE.jpg 800w, https:\/\/northamericanmining.com\/wp-content\/uploads\/2025\/11\/BQE-768x441.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Selen-IX was selected for this project over biological selenium reduction systems due to several factors including the ability to avoid reliance on dilution by meeting the in-stream limit directly at the end of pipe; performance unaffected by cold water temperatures; ability to operate in intermittent mode; ability to handle large and rapid fluctuations in feed flow; and minimization of residue management costs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cI am very proud of our technical team for delivering yet another Selen-IX plant safely and in record time. The project showcases BQE Water\u2019s agility and the capability of the patented Selen-IX technology which enabled the mine site to start discharging clean water into environment in 20 months from the start of engineering,\u201d president and CEO David Kratochvil said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Jasmine McCauley, Environmental Manager of Coeur Mining, added: \u201cThe selenium removal project is an important part of Coeur\u2019s commitment to environmental protection. We truly appreciate BQE Water\u2019s expertise and capabilities to meet our environmental commitments quickly and we look forward to continuing to work with BQE as our technical partner.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Source:<\/em><a href=\"http:\/\/www.bqewater.com\/\"><em> <\/em><em>www.bqewater.com<\/em><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BQE Water reported last week that a new full-scale Selen-IX plant located at Coeur\u2019s Wharf gold mine in South Dakota had passed the performance test and began routine operation. This latest Selen-IX plant set a record time for implementation of 20 months between the design engineering kick-off to the discharge of on-spec water into the environment. The plant is designed&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[495],"tags":[27,790,992,4193],"coauthors":[1644],"class_list":["post-11413","post","type-post","status-publish","format-standard","hentry","category-latest-news","tag-bqe-water","tag-coeur-mining","tag-gold-mine","tag-selenium"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"BQE Water reported last week that a new full-scale Selen-IX plant located at Coeur\u2019s Wharf gold mine in South Dakota had passed the performance test and began routine operation. This latest Selen-IX plant set a record time for implementation of 20 months between the design engineering kick-off to the discharge of on-spec water into the\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"NAM Staff\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"North American Mining Magazine - Bringing the North American Mining Industry Into Focus\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"BQE commences operation of Selen-IX plant at Wharf - North American Mining Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"BQE Water reported last week that a new full-scale Selen-IX plant located at Coeur\u2019s Wharf gold mine in South Dakota had passed the performance test and began routine operation. This latest Selen-IX plant set a record time for implementation of 20 months between the design engineering kick-off to the discharge of on-spec water into the\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-11-17T20:24:12+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-11-17T20:25:22+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/NAminingmag\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"BQE commences operation of Selen-IX plant at Wharf - North American Mining Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"BQE Water reported last week that a new full-scale Selen-IX plant located at Coeur\u2019s Wharf gold mine in South Dakota had passed the performance test and began routine operation. This latest Selen-IX plant set a record time for implementation of 20 months between the design engineering kick-off to the discharge of on-spec water into the\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/#blogposting\",\"name\":\"BQE commences operation of Selen-IX plant at Wharf - North American Mining Magazine\",\"headline\":\"BQE commences operation of Selen-IX plant at Wharf\",\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/BQE.jpg\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/#articleImage\",\"width\":800,\"height\":459},\"datePublished\":\"2025-11-17T20:24:12+00:00\",\"dateModified\":\"2025-11-17T20:25:22+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/#webpage\"},\"articleSection\":\"Latest News, BQE Water, Coeur Mining, gold mine, selenium, nampADM\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/northamericanmining.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/#listItem\",\"name\":\"Latest News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/#listItem\",\"position\":2,\"name\":\"Latest News\",\"item\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/#listItem\",\"name\":\"BQE commences operation of Selen-IX plant at Wharf\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/#listItem\",\"position\":3,\"name\":\"BQE commences operation of Selen-IX plant at Wharf\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/category\\\/latest-news\\\/#listItem\",\"name\":\"Latest News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"telephone\":\"+13032830640\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/NAM_Logo.png\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/#organizationLogo\",\"width\":2384,\"height\":646},\"image\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/@semcopublishing\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/naminingmag\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/\",\"name\":\"NAM Staff\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/#webpage\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/\",\"name\":\"BQE commences operation of Selen-IX plant at Wharf - North American Mining Magazine\",\"description\":\"BQE Water reported last week that a new full-scale Selen-IX plant located at Coeur\\u2019s Wharf gold mine in South Dakota had passed the performance test and began routine operation. This latest Selen-IX plant set a record time for implementation of 20 months between the design engineering kick-off to the discharge of on-spec water into the\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/2025\\\/11\\\/17\\\/bqe-commences-operation-of-selen-ix-plant-at-wharf\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/index.php\\\/author\\\/nampadm\\\/#author\"},\"datePublished\":\"2025-11-17T20:24:12+00:00\",\"dateModified\":\"2025-11-17T20:25:22+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#website\",\"url\":\"https:\\\/\\\/northamericanmining.com\\\/\",\"name\":\"North American Mining Magazine\",\"description\":\"Bringing the North American Mining Industry Into Focus\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/northamericanmining.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"BQE commences operation of Selen-IX plant at Wharf - North American Mining Magazine","description":"BQE Water reported last week that a new full-scale Selen-IX plant located at Coeur\u2019s Wharf gold mine in South Dakota had passed the performance test and began routine operation. This latest Selen-IX plant set a record time for implementation of 20 months between the design engineering kick-off to the discharge of on-spec water into the","canonical_url":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/#blogposting","name":"BQE commences operation of Selen-IX plant at Wharf - North American Mining Magazine","headline":"BQE commences operation of Selen-IX plant at Wharf","author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2025\/11\/BQE.jpg","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/#articleImage","width":800,"height":459},"datePublished":"2025-11-17T20:24:12+00:00","dateModified":"2025-11-17T20:25:22+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/#webpage"},"isPartOf":{"@id":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/#webpage"},"articleSection":"Latest News, BQE Water, Coeur Mining, gold mine, selenium, nampADM"},{"@type":"BreadcrumbList","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","position":1,"name":"Home","item":"https:\/\/northamericanmining.com","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/#listItem","name":"Latest News"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/#listItem","position":2,"name":"Latest News","item":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/","nextItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/#listItem","name":"BQE commences operation of Selen-IX plant at Wharf"},"previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/#listItem","position":3,"name":"BQE commences operation of Selen-IX plant at Wharf","previousItem":{"@type":"ListItem","@id":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/#listItem","name":"Latest News"}}]},{"@type":"Organization","@id":"https:\/\/northamericanmining.com\/#organization","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","url":"https:\/\/northamericanmining.com\/","telephone":"+13032830640","logo":{"@type":"ImageObject","url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2022\/05\/NAM_Logo.png","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/#organizationLogo","width":2384,"height":646},"image":{"@id":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/#organizationLogo"},"sameAs":["https:\/\/www.youtube.com\/@semcopublishing","https:\/\/www.linkedin.com\/company\/naminingmag\/"]},{"@type":"Person","@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author","url":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/","name":"NAM Staff"},{"@type":"WebPage","@id":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/#webpage","url":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/","name":"BQE commences operation of Selen-IX plant at Wharf - North American Mining Magazine","description":"BQE Water reported last week that a new full-scale Selen-IX plant located at Coeur\u2019s Wharf gold mine in South Dakota had passed the performance test and began routine operation. This latest Selen-IX plant set a record time for implementation of 20 months between the design engineering kick-off to the discharge of on-spec water into the","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/northamericanmining.com\/#website"},"breadcrumb":{"@id":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/#breadcrumblist"},"author":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"creator":{"@id":"https:\/\/northamericanmining.com\/index.php\/author\/nampadm\/#author"},"datePublished":"2025-11-17T20:24:12+00:00","dateModified":"2025-11-17T20:25:22+00:00"},{"@type":"WebSite","@id":"https:\/\/northamericanmining.com\/#website","url":"https:\/\/northamericanmining.com\/","name":"North American Mining Magazine","description":"Bringing the North American Mining Industry Into Focus","inLanguage":"en-US","publisher":{"@id":"https:\/\/northamericanmining.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"North American Mining Magazine - Bringing the North American Mining Industry Into Focus","og:type":"article","og:title":"BQE commences operation of Selen-IX plant at Wharf - North American Mining Magazine","og:description":"BQE Water reported last week that a new full-scale Selen-IX plant located at Coeur\u2019s Wharf gold mine in South Dakota had passed the performance test and began routine operation. This latest Selen-IX plant set a record time for implementation of 20 months between the design engineering kick-off to the discharge of on-spec water into the","og:url":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/","og:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png","og:image:secure_url":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png","article:published_time":"2025-11-17T20:24:12+00:00","article:modified_time":"2025-11-17T20:25:22+00:00","article:publisher":"https:\/\/www.facebook.com\/NAminingmag","twitter:card":"summary","twitter:title":"BQE commences operation of Selen-IX plant at Wharf - North American Mining Magazine","twitter:description":"BQE Water reported last week that a new full-scale Selen-IX plant located at Coeur\u2019s Wharf gold mine in South Dakota had passed the performance test and began routine operation. This latest Selen-IX plant set a record time for implementation of 20 months between the design engineering kick-off to the discharge of on-spec water into the","twitter:image":"https:\/\/northamericanmining.com\/wp-content\/uploads\/2021\/05\/cropped-NAM_Logo_400.png"},"aioseo_meta_data":{"post_id":"11413","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2025-11-17 20:24:18","updated":"2025-11-17 20:32:02","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/\" title=\"Latest News\">Latest News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tBQE commences operation of Selen-IX plant at Wharf\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/northamericanmining.com"},{"label":"Latest News","link":"https:\/\/northamericanmining.com\/index.php\/category\/latest-news\/"},{"label":"BQE commences operation of Selen-IX plant at Wharf","link":"https:\/\/northamericanmining.com\/index.php\/2025\/11\/17\/bqe-commences-operation-of-selen-ix-plant-at-wharf\/"}],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/11413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/comments?post=11413"}],"version-history":[{"count":2,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/11413\/revisions"}],"predecessor-version":[{"id":11416,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/posts\/11413\/revisions\/11416"}],"wp:attachment":[{"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/media?parent=11413"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/categories?post=11413"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/tags?post=11413"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/northamericanmining.com\/index.php\/wp-json\/wp\/v2\/coauthors?post=11413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}